Typical prices — Electrical
These are guide prices and preset baselines, not a silent promise. Use them to understand the range first, then move into the fuller quote route when the job needs room, access or condition detail.
Typical price guide — Electrical
EV charger (Level 2 home)
Includes dedicated circuit, OLEV-registered unit. Excludes consumer unit upgrade if needed.
Typical: 4–6 hours
£650 – £1,100
per install · excl. VAT
Consumer unit upgrade
9–16 way RCBO board, labour and materials.
Typical: 1 day
£420 – £750
per job · excl. VAT
Partial rewire (1 floor)
New circuits, back-boxes, wiring but not full strip-out.
Typical: 2–3 days
£1,200 – £2,200
per floor · excl. VAT
Full rewire (3-bed)
Full strip and replacement. Significant disruption.
Typical: 5–7 days
£2,800 – £5,000
per property · excl. VAT
EICR condition report
Depends on size and age. Does not include remedials.
Typical: 2–4 hours
£150 – £280
per report · excl. VAT
Additional sockets / circuit
Varies by distance from consumer unit and access difficulty.
Typical: 2–4 hours
£90 – £220
per circuit · excl. VAT
Clarification notes
Preset jobs in this trade
Add socket
Install a new single or double power socket in a dry room. Not suitable for bathrooms, shower rooms, or wet areas.
Budget Option
Standard socket outlet £5–£15
Most Common
Double socket or USB-integrated outlet £15–£40
Premium Option
Smart sockets, designer finishes, or weatherproof outdoor sockets £40–£120
Typical Time
45 minutes to 1.5 hours per socket
What Could Increase Cost
Additional cost if the wall is tiled, plastered hard, or contains hidden pipes or cables. Long cable runs also increase labour.
These are guide prices only
Prices vary by location, access, property condition and scope. Request a detailed quote with photos and a brief to get an accurate price.
For an accurate number
Detailed Quote
Upload photos, describe your rooms and requirements. Get a specific, itemised quote.
Request a detailed quoteNeed it today?
FastTrack
Use the preset-led route where the job is standard enough to move quickly.
Open FastTrackNot sure which route fits?
Ready to Book
Compare scope, clarifications and next-step rules before turning the guide into an active route.
Open readiness check