Typical prices — Electrical
These are guide prices and preset baselines, not a silent promise. Use them to understand the range first, then move into the fuller quote route when the job needs room, access or condition detail.
Typical price guide — Electrical
EV charger (Level 2 home)
Includes dedicated circuit, OLEV-registered unit. Excludes consumer unit upgrade if needed.
Typical: 4–6 hours
£650 – £1,100
per install · excl. VAT
Consumer unit upgrade
9–16 way RCBO board, labour and materials.
Typical: 1 day
£420 – £750
per job · excl. VAT
Partial rewire (1 floor)
New circuits, back-boxes, wiring but not full strip-out.
Typical: 2–3 days
£1,200 – £2,200
per floor · excl. VAT
Full rewire (3-bed)
Full strip and replacement. Significant disruption.
Typical: 5–7 days
£2,800 – £5,000
per property · excl. VAT
EICR condition report
Depends on size and age. Does not include remedials.
Typical: 2–4 hours
£150 – £280
per report · excl. VAT
Additional sockets / circuit
Varies by distance from consumer unit and access difficulty.
Typical: 2–4 hours
£90 – £220
per circuit · excl. VAT
Clarification notes
Preset jobs in this trade
Smoke / heat alarm install or replacement
Install new mains-powered smoke or heat alarms, or replace existing ones. Wired into the lighting circuit for interconnected coverage.
Budget Option
Standard mains smoke alarm £15–£35
Most Common
Heat alert or interconnectable smoke alarm £35–£80
Premium Option
Smart or wireless interconnected system per unit £80–£150
Typical Time
30–45 minutes per alarm
What Could Increase Cost
Cost increases with number of alarms, complexity of wiring routes, or if interlinked wireless systems are chosen.
These are guide prices only
Prices vary by location, access, property condition and scope. Request a detailed quote with photos and a brief to get an accurate price.
For an accurate number
Detailed Quote
Upload photos, describe your rooms and requirements. Get a specific, itemised quote.
Request a detailed quoteNeed it today?
FastTrack
Use the preset-led route where the job is standard enough to move quickly.
Open FastTrackNot sure which route fits?
Ready to Book
Compare scope, clarifications and next-step rules before turning the guide into an active route.
Open readiness check